Loft: Follow up to electrical additions

I got my revised schedule of extras and upgrades last week, which now includes the additional cost of the electrical and plumbing work. I was pleasantly surprised by the total cost for both being $1375.00. Much less than I was lead to believe and much more in the range of cost I had imagined it would be.

Leave a Comment

You must be logged in to post a comment.